Aircraft & Vehicles

Carrying the Load: The Story of the Airbus A400M Atlas

22 November 2026 · 16 min read
Two soldiers of B Company, 2nd Battalion, The Parachute Regiment come away from an RAF Atlas over Visby on Gotland during NATO's Exercise Swift Response 25, one canopy still opening off the wing, 20 May 2025
Two soldiers of B Company, 2nd Battalion, The Parachute Regiment come away from an RAF Atlas over Visby on Gotland during NATO's Exercise Swift Response 25, one canopy still opening off the wing, 20 May 2025

For more than half a century the Royal Air Force's workhorse transport was the Lockheed Hercules, an American design that first flew in 1954.

When the last RAF Hercules landed for good in June 2023, its place was taken by something very different: a big, grey, four-engined European airlifter with propellers that look as if they have been fitted the wrong way round, able to carry twice the load of the aircraft it replaced and still land on a beach.

The Airbus A400M, known in RAF service as the Atlas C1, had a long and painful birth, years late, billions over budget and marred by a fatal crash before it had properly entered service.

It has since become one of the busiest aircraft in the RAF, dropping paratroopers over Normandy and Gotland, flying evacuees out of Sudan, dropping food over Gaza and delivering everything from armoured vehicles to helicopters to wherever British forces are needed.

This is the Atlas's story: where it came from, why it took so long, how it works, what it has done for the RAF, and what lies ahead. Facts have been checked against at least two independent sources, among them Airbus, the Royal Air Force, the Ministry of Defence and Defence Equipment and Support, OCCAR, the European Union Aviation Safety Agency and the specialist aviation press. Where they disagree we say so.

A400M Atlas at a Glance

What it is: a four-engined turboprop military transport, built by Airbus at Seville in Spain for a consortium of European nations. First flight: 11 December 2009, at Seville. RAF name: Atlas C1. First RAF aircraft: ZM400, delivered to RAF Brize Norton on 17 November 2014. RAF fleet: 22, cut from an original order of 25; the last was delivered in May 2023. Squadrons: LXX (70) Squadron, 30 Squadron and XXIV Squadron, the operational conversion unit, all at Brize Norton. Replaced: the C-130 Hercules, retired in June 2023.

A European Airlifter, 1980s to 2003

The idea of a common European military transport goes back to the early 1980s, when several European air forces realised that their Hercules and the Franco-German Transall would all need replacing at about the same time. Studies under various names dragged on for nearly twenty years, as governments argued about requirements, work shares and money, and Italy eventually dropped out.

The deal was finally done in Bonn in May 2003, when Airbus Military signed a contract with OCCAR, the European defence procurement agency, for 180 aircraft for seven launch customers: Germany, France, Spain, the United Kingdom, Turkey, Belgium and Luxembourg. Malaysia joined in 2005.

The contract was worth some 20 billion euros, and it was a fixed-price deal of a kind Airbus would come to regret.

The A400M was designed to fill the gap between the Hercules and the much bigger Boeing C-17 Globemaster. It had to be able to fly far and fast enough to be a strategic transport, carrying heavy loads between continents, and also tough and agile enough to be a tactical one, landing on short, rough strips near the front line and dropping paratroopers and supplies.

Doing both in one aircraft was the whole point, and the whole difficulty.

The Engines That Turn the Wrong Way

The A400M's most distinctive feature is its propulsion. Each wing carries two Europrop TP400-D6 turboprops of about 11,000 shaft horsepower, among the most powerful turboprops ever built in the West, each driving a big eight-bladed propeller.

On each wing the two propellers turn in opposite directions, the blades sweeping down between the engines. Airbus calls the layout "Down Between Engines".

It reduces the swirl of air over the wing, improves lift and makes the aircraft easier to handle, especially at low speed and with an engine out, and it is the reason every photograph of an A400M seems to show its propellers turning the wrong way.

The engine was itself a new design, built by a consortium of Rolls-Royce, Safran, MTU and ITP Aero, and it was the source of much of the programme's delay. Its software, its gearboxes and the integration of its digital control system with the aircraft all caused problems that took years to fix.

Delays, Costs and First Flight

The first flight had been planned for early 2008. It finally came on 11 December 2009, when the prototype took off from Seville for a flight of nearly four hours.

By then the programme was years behind schedule and billions of euros over budget, and in 2010 the partner nations and Airbus had to renegotiate the contract to keep it alive, with the governments agreeing to pay more and Airbus absorbing heavy losses. Several nations, the UK among them, cut their orders. Britain went from 25 aircraft to 22.

The first production aircraft were delivered to France in 2013, with Turkey and then the UK following in 2014.

The Seville Crash, 2015

On 9 May 2015 an A400M on a pre-delivery test flight, due to be handed over to the Turkish Air Force, crashed in a field near Seville airport shortly after take-off. Four of its six crew were killed. Three of its four engines had lost power soon after it left the ground.

The cause turned out to lie in the software. During the installation of the engine control software at Airbus's facilities, data known as torque calibration parameters had been accidentally wiped on three of the engines, leaving their electronic controls unable to read the engines properly.

The aircraft had been allowed to fly without the error being detected on the ground. Britain, Germany, Spain, Turkey and Malaysia suspended their A400M flights; the RAF resumed flying on 16 June 2015 after one-off checks had been made on its aircraft.

Airbus changed its procedures, and the crash remains the A400M's only fatal accident.

Into RAF Service: Brize Norton, 2014 to 2023

An RAF Atlas lifts off from the sand during beach landing and take-off trials at Pembrey Air Weapons Range in South Wales, a curtain of sand blowing up behind it, 18 May 2017
An RAF Atlas lifts off from the sand during beach landing and take-off trials at Pembrey Air Weapons Range in South Wales, a curtain of sand blowing up behind it, 18 May 2017

The first RAF Atlas, ZM400, arrived at Brize Norton in Oxfordshire on 17 November 2014. LXX Squadron, which had stood up the month before, became the first operational Atlas squadron, and RAF crews and engineers spent the following years learning the aircraft and slowly clearing it for its full range of roles.

A new maintenance, repair and overhaul hangar was built at Brize Norton at a cost of around £70 million to look after the fleet.

Many of the tactical roles took far longer to clear than anyone had hoped. Parachuting from both side doors at once, the standard method for a mass drop, was held up for years by concerns about the way the aircraft's wake affected jumpers, and it was 2023 before the RAF retired its last Hercules.

Trials continued throughout, including landings and take-offs on the beach at Pembrey Sands in South Wales in May 2017 to clear the Atlas to operate from unprepared surfaces. When the last Hercules was retired in June 2023, the Atlas took over the tactical airlift and parachuting role in full. 30 Squadron, which had flown the Hercules, now flies the Atlas alongside LXX Squadron, while XXIV Squadron trains the crews.

Ready for the World, 2015 to 2021

The Atlas was declared in service in 2015, when the seventh RAF aircraft was handed over, and its early operational work was mostly freight: regular runs to RAF Akrotiri in Cyprus supporting the campaign against Islamic State, and to British forces around the world. It soon found itself on the front line of disaster relief.

In September 2017, after Hurricane Irma tore through the Caribbean, two Atlases flew aid into the British Overseas Territories on Operation Ruman, carrying far more on each flight than the Hercules could.

In 2018 an Atlas delivered 17.5 tonnes of British aid to Indonesia after the earthquake and tsunami on Sulawesi, and in 2019 Atlases flew water filters, solar lanterns, blankets and shelter kits into Mozambique after Cyclone Idai. During the pandemic the fleet helped move vaccines, and in 2022 it flew a military aid package to Pakistan after the floods.

The RAF also keeps an Atlas detachment in the Falkland Islands, where it has taken over the transport, patrol and air drop work the Hercules used to do for the garrison.

Kabul, August 2021

The Atlas's hardest test before the Hercules left came in August 2021, when the Taliban took Kabul and the UK mounted Operation Pitting to evacuate British nationals and Afghans who had worked with British forces.

Over a fortnight RAF transports, C-17s, Atlases, Hercules and Voyagers, flew in and out of Kabul airport under the threat of attack, with RAF crews and the Army's paratroopers working through chaotic scenes at the airport gates. The RAF flew out more than 15,000 people between 14 and 28 August, far more than the 2,500 or so first planned for.

Atlases flew some of the last British departures from Kabul on 28 August, as the operation came to an end.

What the Atlas Can Carry

Atlas ZM420 above a layer of cloud over the United States, photographed from a Voyager tanker on the nonstop flight from Brize Norton to Guam for Exercise Mobility Guardian 23, 3 July 2023
Atlas ZM420 above a layer of cloud over the United States, photographed from a Voyager tanker on the nonstop flight from Brize Norton to Guam for Exercise Mobility Guardian 23, 3 July 2023

The A400M's hold is the key to its usefulness. It can carry a maximum payload of 37 tonnes, roughly twice as much as a Hercules, or up to 116 fully equipped paratroopers, or 66 stretchers for medical evacuation.

Its hold is big enough for armoured vehicles, light helicopters, engineering plant and bulky outsize loads that would never fit in a Hercules, and it is fitted with roller tracks and locks so that pallets can be run out of the back by gravity during an airdrop.

It can be equipped to refuel other aircraft from wing pods, and can take on fuel itself from tankers such as the RAF's Voyager. In July 2023, on the opening leg of the RAF's part in Exercise Mobility Guardian 23, an Atlas flew nonstop from Brize Norton to Guam in the Pacific in about 22 hours, taking on fuel from Voyagers three times along the way, the longest flight yet made by the type.

Low Level: The Mach Loop and the Highlands

Atlas ZM421 banks low over a green, rock-strewn slope of the Mach Loop in mid Wales, a vapour trail streaming from its wingtip, 24 June 2024
Atlas ZM421 banks low over a green, rock-strewn slope of the Mach Loop in mid Wales, a vapour trail streaming from its wingtip, 24 June 2024

For all its size, the Atlas is built to fly low and tactically, hugging valleys to stay out of sight of an enemy on the way to a drop zone or a landing strip. RAF crews practise terrain masking through the valleys of mid Wales, in the circuit known as the Mach Loop between Dolgellau and Machynlleth, where photographers gather on the hillsides to watch aircraft fly past below them.

In June 2024 Atlas 418 was photographed banking through the mist there, in a picture we offer as Atlas Banking Through Mist in the Mach Loop.

The Scottish Highlands are another training ground. In 2025 an RAF photographer took a picture of a loadmaster standing on the open ramp of an Atlas, clipped on by a harness strap, as the aircraft flew low down a Highland glen towards the Cairngorms, a photograph placed in the RAF's photographic competition and offered here as Loadmaster Ramp Riding in the Scottish Highlands.

Paratroopers: D-Day 80, Gotland and Salisbury Plain

Paratroopers of 16 Air Assault Brigade jump from the side door of Atlas ZM415 over Salisbury Plain during the largest military parachute drop in the UK for more than a decade, 30 March 2026
Paratroopers of 16 Air Assault Brigade jump from the side door of Atlas ZM415 over Salisbury Plain during the largest military parachute drop in the UK for more than a decade, 30 March 2026

The Atlas's most visible job is carrying the paratroopers of 16 Air Assault Brigade, the British Army's rapid response formation. On 5 June 2024, for the eightieth anniversary of D-Day, three Atlases from Brize Norton dropped the brigade's paratroopers over Sannerville in Normandy, close to the ground where British airborne forces had landed in 1944.

Before take-off the soldiers queued on the airfield in the sunshine to board, in our print of 16 Air Assault Brigade boarding for D-Day 80.

In May 2025, on NATO's Exercise Swift Response, soldiers of the 2nd Battalion, The Parachute Regiment jumped from an RAF Atlas over Visby on the Swedish island of Gotland to seize a landing zone, a reminder that the Baltic is where Britain's airborne forces now expect they might have to fight.

The same month an Atlas of 70 Squadron flew paratroopers from Brize Norton to northern Norway for the exercise, in our print of the Atlas cockpit over Norway.

The biggest drop for years came on 30 March 2026. As a proof of concept for the new Joint Airborne Task Force, a very high readiness force drawn from 16 Air Assault Brigade and the RAF's Air Mobility Force, some 270 paratroopers jumped from three Atlases over Salisbury Plain, the largest military parachute drop in the UK for more than a decade.

A fourth Atlas dropped around 24 tonnes of quad bikes, ammunition and other supplies by container delivery system, eighteen container pallets in all, seen from inside the hold in our print of the ramp view of the container drop. The paratroopers had boarded at Brize Norton that morning, in our print of 16 Air Assault Brigade boarding ZM417.

Evacuations and Aid: Sudan and Gaza

Atlas ZM401 on a sunlit desert apron, crew door open, as a forklift brings pallets for a humanitarian airdrop of about 10,000 kg of aid over northern Gaza, 21 April 2024
Atlas ZM401 on a sunlit desert apron, crew door open, as a forklift brings pallets for a humanitarian airdrop of about 10,000 kg of aid over northern Gaza, 21 April 2024

The Atlas's ability to land on rough strips has made it invaluable in emergencies. When fighting broke out in Sudan in April 2023, RAF Atlases, Hercules and C-17s flew British nationals out of Wadi Seidna, an airfield north of Khartoum, to Cyprus.

The propeller-driven Atlas and Hercules were better suited to the battered airfield than the jets, and one Atlas crew alone flew eight of the evacuation flights. Between about 2,100 and 2,450 people were flown out, depending on whose count is used, before the last flight left the airfield on the night of 29 April.

In 2024 RAF Atlases dropped humanitarian aid over Gaza. On 21 April 2024 Atlas ZM401 carried about 10,000 kg of aid, loaded by the Army's 47 Air Despatch Squadron, for an airdrop over the north of the territory. It was the first time an RAF Atlas had delivered humanitarian aid by parachute.

Royal Flypasts

Atlas ZM400, the first delivered to the RAF, banks away above white cumulus during the final rehearsal for the Queen's Platinum Jubilee flypast, 24 May 2022
Atlas ZM400, the first delivered to the RAF, banks away above white cumulus during the final rehearsal for the Queen's Platinum Jubilee flypast, 24 May 2022

The Atlas has become a regular in the great royal flypasts over London. For the Queen's Platinum Jubilee in June 2022 it flew in close formation with a 99 Squadron C-17 Globemaster, and during the final rehearsal ZM400, the first RAF Atlas, was photographed banking away above the cloud.

In April 2023 an Atlas and a Voyager rehearsed together over RAF College Cranwell for the Coronation flypast, in our print of a Voyager and an Atlas low over farmland, and on 14 June 2025, the day of the King's Birthday Parade, an Atlas was photographed passing directly over Buckingham Palace with the crowds packed around the Queen Victoria Memorial below, in our print of an Atlas over Buckingham Palace.

In October 2025 an Atlas of 30 Squadron flew as the camera ship for a photographic sortie with the Battle of Britain Memorial Flight's Lancaster, Dakota and Spitfire, with RAF photographers working from its open ramp. One of the results is our print of the Dakota with the Atlas in the background.

Agile Warrior, 2026

Airmen of 1 Expeditionary Logistics Squadron draw fuel from Atlas 419 on the runway at RAF Wittering during Exercise Agile Warrior, 10 March 2026
Airmen of 1 Expeditionary Logistics Squadron draw fuel from Atlas 419 on the runway at RAF Wittering during Exercise Agile Warrior, 10 March 2026

In March 2026 the RAF ran Exercise Agile Warrior at Wittering in Cambridgeshire, testing how it would move to a war footing and keep aircraft flying from dispersed sites if its main bases came under attack. Atlas 419 flew in, and airmen of 1 Expeditionary Logistics Squadron drew fuel straight out of its tanks, using the transport as a mobile fuel station on the runway.

The exercise was a glimpse of how the Atlas could be used in a major war: not just to carry troops and freight, but to keep other aircraft flying from places with none of the usual support.

Availability and the Future

The Atlas's biggest problem in RAF service has been keeping enough of them flying. A small fleet of complex aircraft, with spares, engine and gearbox issues inherited from the programme's troubled development, has often struggled to meet demand.

In October 2026 the Ministry of Defence extended Airbus's support contract by about £190 million, running to April 2029, with the aim of raising the number of fully mission-capable aircraft available each day from ten to thirteen by the end of 2027. Ministers had already promised more aircraft for worldwide tasking from March 2026.

Abroad, the A400M is finding new customers and more orders from existing ones: Germany has authorised the purchase of more aircraft, and Indonesia has ordered it. For the RAF, the Atlas, the C-17 and the Voyager now make up the whole of the transport and tanker fleet at Brize Norton, and the Atlas carries much of the weight.

A400M Atlas Specifications

Airbus A400M Atlas C1: four Europrop TP400-D6 turboprops of about 11,000 shaft horsepower each, driving eight-bladed propellers; wingspan 42.4 m (139 ft); length 45.1 m (148 ft); maximum payload 37 tonnes; up to 116 paratroopers or 66 stretchers; flight crew of two pilots, with loadmasters in the hold; able to refuel other aircraft and to be refuelled in flight.

Atlas Photo Prints

Our A400M Atlas photo prints follow the type from beach trials at Pembrey to the Mach Loop, the Highlands, Gaza, Guam, Gotland, D-Day 80, Agile Warrior at Wittering and the great parachute drop over Salisbury Plain in 2026. You will find more in our RAF aircraft prints from 2001 to the present, and the wider story of the service in our history of the Royal Air Force.

Follow @Hantsprints on X for more British military aircraft and vehicle history and photography.
Follow on X

Leave a comment

Please note, comments must be approved before they are published

This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.

Written by
Lee Edwards

Lee writes the ship histories and fleet features for Hampshire Prints. He served in the Royal Navy, and some of the modern fleet photographs on this site are his own, taken from the Portsmouth shoreline.

More about Lee